Local

Route 8 improvement project to cause restrictions through late July in Etna, Shaler

Triblive
By Triblive
1 Min Read June 13, 2025 | 6 months Ago
Go Ad-Free today

PennDOT is alerting motorists that single-lane restrictions are in place through late July for improvement work on a stretch of Route 8 also known as Butler Street.

Restrictions are in place from 9 a.m. to 3 p.m. weekdays and 7 p.m. to 5 a.m. weeknights on Route 8 between the 62nd Street Bridge and Baker Street. Crews will begin milling and paving operations Monday night, June 16. Work will occur on weekends as needed.

This $9.14 million project spanning Pittsburgh, Etna and Shaler began in August with inlet improvements on Route 8.

The project between Baker Street and the 62nd Street Bridge in the southern portion includes milling and resurfacing, retaining wall repairs and the installation of a barrier to separate travel lanes from a future shared-use path.

The northern portion of the project is between the 62nd Street Bridge and Saxonburg Boulevard and includes concrete pavement restoration and preservation work on two structures carrying Route 8 over Pine Creek.

Additional work throughout the project includes sign and signal upgrades, guide rail updates, drainage work, ADA curb ramp updates and pavement markings/delineation installation.

The project is expected to conclude later this year.

Share

Categories:

Tags:

About the Writers

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Content you may have missed

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options